Flew to OKlahoma for a customer so test out some issues of their 40 ton split unit systems and 75,000 watt room . They had 6 Anden 320 industrial Dehumes .. complaints were : PM - or “powerder mildew Inconstant temps - Air flow - Long story short ,these guys were 35 percent oversized and short cycling was occurring after looking all controls and sensors all day . They had all indoor coils on “fan auto” when they should be on “on “ for greater air circulation especially for four 10 tons ton coils belt driven . Found I could hit their desired with 20 tons or two 10 tons Diakins . Set the temp at 73F and they planed out at 77 . No more short cycling and way less wear . Outside temp was 75F and 58rh . Third is now used as redundant as watch dog at 79F .

Posted by Deleted (b8c4437d) at 2021-05-04 02:38:00 UTC