Any Rheem guys out there? #3. My brother in law bought his own equipment and I see this in the manual. 3/4" was roughed in and the ceiling is now finished. Furnace is in the basement so Evap coil will be lower. It will be a longer lineset too which is going to affect oil return. Tell him to rip down the ceiling or send it?
Posted by NWMech at 2025-07-04 21:19:32 UTC